The better side of the car as she arrived from MNGM.
The "not so good" side being resheathed.
The car interior before any work was done.
All painted. She still needs lettering and ownership stenciling.
New bench seats installed. This car was put in service for our Ghost Train on 10/11/2008.
![]()
Page URL: http://www.srrl-rr.org/Projects/BH_54/BH_54.htm
Copyright 2009 Sandy River & Rangeley Lakes Railroad
Webmaster: Bob Troup (webmaster@srrl-rr.org)
Revised: 05/06/2009